Made with Formlio


Lounge with green joinery, plaster walls and an oak bar


Pellow Vance Interiors





Design retainer · Pellow Vance Interiors



One studio for both Hollin houses.



A monthly interiors retainer for Marylebone and the new Shoreditch house, from March 2027 through opening and the first winter.

Prepared for

Hollin Club



Term

12 months from 1 March 2027



Monthly fee

£17,576 plus VAT

Lounge with green joinery, plaster walls and an oak bar
Why a retainer



Why a retainer, not a project



Shoreditch opens in September. Marylebone keeps trading the whole time. Two fixed-fee projects would mean two handovers and nobody watching both houses.



You told us in January that members already compare the two, and that the new house has to feel like the same club without copying the first. That is a continuous job, not a scope.

So we're proposing a set number of days each month, one team and one specification both sites order from. Kit holds the account, Ada leads the design. If we've misread any of this, tell us before you read on.

Same club, two addresses, one hand on every detail.
Same club, two addresses, one hand on every detail.
Same club, two addresses, one hand on every detail.
Same club, two addresses, one hand on every detail.
Same club, two addresses, one hand on every detail.

What the retainer covers



Six areas of work drawn from one pool of days. Shoreditch takes the larger share until it opens, then the balance swings back to Marylebone.







Shoreditch, to opening



Developed design, joinery details and the finish schedule for four floors, 31 bedrooms and the rooftop dining room.





Marylebone, kept current



A rolling refresh of the bar and bedrooms. Reupholstery, lighting scenes and wear replacement planned a quarter ahead.





One live specification



A shared specification platform both houses order from. Every finish, supplier and lead time visible to your ops team.





Procurement and tracking



Orders placed in your name at trade price and tracked on a live FF&E dashboard from sample approval to delivery.





3D before anything ships



Photoreal visuals and a VR walkthrough of each new room, signed off before a single order goes in.





Light and acoustics



Lighting scenes on the smart system and acoustic treatment for dining rooms that seat 70 covers on a Friday.

Wexley House, King's Cross

A members' house over three floors of a new building. Fourteen months on retainer, opened on the date set at appointment, waitlist closed at 1,900.


Members' lounge with green banquettes and fluted plaster

Brindle, Canary Wharf

A 64-cover restaurant and bar at the foot of a new residential tower. The slatted acoustic ceiling took reverberation from 1.9 to 0.7 seconds.


Restaurant with oak tables and a slatted timber ceiling

Fenmore Hotel, Hackney Wick

Forty-two bedrooms specified from one live schedule. Every room installed in nine working days and the snag list closed in two.


Hotel bedroom with an oak headboard and green marble side table

The sample wall, Mare Street

Every finish we specify is tested at full size against north light in the studio before it reaches your team.


Material samples in green lacquer, plaster, brass and oak

How a month runs



The same rhythm every month, set around your operations meeting so decisions land where they're needed.



Planning call, first Tuesday

Kit and your head of houses agree where the month's days go across both sites. Anything urgent displaces something, and we'll say what.

Design in the open

Drawings, visuals and the specification sit on the shared platform. Your team comments there, not across four email threads.

Site walk, every Thursday

Kit walks Shoreditch weekly through the build and Marylebone fortnightly. Snags go on the list the same afternoon.

Order sign-off in three days

Nothing is ordered without your approval in the platform. Sign-off inside three working days keeps the lead times honest.

Month close, last Friday

One page: days used against the cap, orders placed, what rolls forward. Unused days carry over for one month only.

From clients we've held a retainer with



The monthly fee



In GBP, plus VAT. Built from our day rates: creative director 950, account lead 780, senior designer 720, designer 560, procurement 480. FF&E is not in this fee. Goods are invoiced to you at trade price with the full discount passed on.



Core retainer

March 2027 to February 2028. Twenty-six studio days a month across both houses.

Monthly retainer

Total
$17576.00/ month

Monthly retainer

Item
Price
Quantity
Total

Creative direction, Ada Pellow

Three days a month, both houses.



$2850.00/ month

Account lead and site walks, Kit Vance

Three days a month.



$2340.00/ month

Design and specification

Eight senior designer and six designer days.



$9120.00/ month

Procurement and order tracking

Six days a month on the FF&E dashboard.



$2880.00/ month

Specification platform and VR licence

Seats for your ops and finance teams.



$386.00/ month
Total
$17576.00/ month

Opening surge, June to August 2027

Optional. Extra install and styling capacity for the three months before Shoreditch opens.

Opening surge

Total
$5636.00/ month

Opening surge

Item
Price
Quantity
Total

Install and styling crew

Eight extra days a month, Shoreditch only.



$4160.00/ month

Out-of-hours site cover

Up to twelve evening hours a month.



$1476.00/ month
Total
$5636.00/ month





Subtotal
$17576.00/ month
Total (before tax)
$17576.00/ month
VAT (20%)
$3515.20/ month
Total
$21091.20/ month

Notice, scope and the hours outside them



The parts that decide whether a retainer stays a good deal for both sides.



What happens when a month needs more than 26 days

We tell you before it happens, not on the invoice. Extra days are billed at the same day rates and only once you've approved them in the platform. If an overrun repeats three months running, we'll propose resizing the retainer rather than billing extras.

What the retainer does not cover

Base build and MEP design, which stay with your architect and contractor. Building control and landlord approvals. Artwork purchase and curation. The FF&E itself. The Shoreditch budget is £1.42m to £1.56m plus a 10 percent contingency you hold, invoiced to you at trade price.

Lead times and the September opening

Lead times set this programme, not drawing time. Bespoke upholstery runs 14 weeks, joinery 10, stone 7. For install from Monday 16 August 2027 and opening on Wednesday 15 September, upholstery has to be signed off by Friday 7 May. Each week of late sign-off moves either the date or the specification, and we'll tell you which.

Out-of-hours work

Marylebone trades until 1am, so installs there run between 7am and 11am, or on Mondays when the house is closed. Evening and weekend site time is billed at 1.5 times the day rate, or drawn from the opening surge hours if you take them.

Minimum term and notice

Twelve months minimum, then rolling with three months' notice from either side. Orders already placed in your name stay yours. Deposits on cancelled orders follow each supplier's terms, which we show in the platform before you approve the order.

Photographing the finished houses

We'd like to photograph both houses once open, on a closed morning you choose. Nothing is published without your sign-off, and no member appears in any picture.

Next step



This proposal holds until Friday 19 February 2027. Sign below and Kit books the first planning call for Tuesday 2 March, at Marylebone.



Prepared by



Kit Vance Co-founder and Account Lead, Pellow Vance Interiors

2nd Floor, 64 Mare Street London E8 4RT kit@pellowvance.co.uk

For approval by



Priya Lomax Chief Operating Officer, Hollin Club

Ada and Kit can walk the Shoreditch shell with you on Thursday 11 February if you'd rather talk it through first.

Sign here
En approuvant ce document, vous le signez électroniquement.

Appoint Pellow Vance Interiors

By signing, you appoint us on a 12 month retainer from Monday 1 March 2027 at £17,576 a month plus VAT, invoiced on the first working day of each month. FF&E is invoiced separately at trade price. The opening surge is confirmed separately by Friday 30 April 2027.