Made with Formlio



Pinyon Studio

The Desai Kowalczyk House

Interior design and FF&E proposal from Pinyon Studio, Denver. Prepared for Priyanka Desai and Martin Kowalczyk on Tuesday 16 February 2027.

The brief



Your brief, and three ways to run it



01

What you asked for



A 5,400 sq ft house above Evergreen, completing on 1 October 2027. Fourteen rooms to furnish, a move-in before the holidays, and an FF&E budget you'd like held near $560,000. If we have any of this wrong, tell us before reading on.

02

Option A, design only



We design and specify, you buy. The lowest fee, but you carry around 60 orders, freight claims and lead-time chasing yourselves. Realistic move-in: February 2028.

03

Option B, full service



We design, order, receive, install and style. A higher fee, one point of contact, trade pricing passed through in full. Move-in: the first week of November 2027. This is our recommendation.

04

Option C, phased



Main floor now, lower level and guest suite in 2028. It spreads the spend, but you live through a second install and pay for two rounds of freight.

A house this open needs fewer, better pieces, ordered early.
AA hhoouussee tthhiiss ooppeenn nneeeeddss ffeewweerr,, bbeetttteerr ppiieecceess,, oorrddeerreedd eeaarrllyy..

The house, room by room



A first view of the scheme, drawn from two walkthroughs and your answers to our lifestyle questionnaire. Concept will test it in 3D before anything is specified.



Great room, facing the Front Range

Two low sofas in a performance wool, an 11 ft walnut table and nothing taller than 36 inches between you and the glass. The view does the work and the furniture stays out of its way.

Kitchen and pantry

White oak joinery with a honed quartzite top, a walk-in pantry with its own sink, and lighting on three circuits so the island can go dark while the range stays lit.

Primary suite

Plaster walls, a linen headboard built into the joinery and motorized shades on the bedtime scene. Closet joinery sized to your actual wardrobe count, not a catalog module.

Lower level and guest suite

A den with acoustic panels behind oak slats, and a guest suite furnished to read as a small hotel room rather than overflow storage.

Mudroom and entry

A bench, heated boot drawers and a stone floor that takes snow. The room you will use most in January deserves the same attention as the great room.

How the project runs



Thirty-five weeks from the first site visit on 2 March to styling at the end of October. Lead times, not design, decide the move-in date.



Brief and concept, weeks 1 to 4

Site measure and lifestyle sessions, then two schemes for each main room, walked through in VR before you choose.

Developed design, weeks 5 to 9

Plans, elevations, joinery drawings and a lighting plan with smart scenes. One consolidated round of comments.

Specification, weeks 10 to 12

Every piece priced in the live FF&E tracker. You approve the budget line by line before a single deposit is paid.

Procurement, weeks 13 to 33

Orders placed in the first two weeks of June. Upholstery runs 14 to 16 weeks and sets the date for everything else.

Install and styling, weeks 34 to 35

Deliveries consolidated at our receiving warehouse, then one install week in October and three days of styling.

Four houses, furnished end to end



Each one designed, ordered, installed and styled by the people named below. The outcomes are the owners' numbers, shared with their permission.



Larkspur Ridge House, Boulder

A 4,800 sq ft new build with twelve rooms to furnish. Installed in four days, handed over 3 percent under the approved FF&E budget, and not one piece returned.


Living room at Larkspur Ridge House

Sawtooth Row show homes, Golden

Three show homes specified in our live tracker for a developer. Two of the three sold furnished within six weeks of listing, at the asking price.


Dining room in a Sawtooth Row show home

Lowry penthouse, Denver

2,900 sq ft turned around in 22 weeks from brief to styling. Every upholstered piece was ordered in week nine, which is the only reason it worked.


Lowry penthouse living area at dusk

Gold Hill House, Gold Hill

A great room and dining room redesigned around one view line, tested in VR before anything was ordered. The table moved 40 inches and every seat now faces the peaks.


Great room at Gold Hill House

Who will be in your house



Pinyon Studio was founded in Denver in 2018 and is nine people. These five will run your project from the first site measure to the last cushion.



Design fee and FF&E budget



All figures in USD. The design fee is built from day rates: principal 1,960, senior designer 1,480, designer 1,120, visualizer 1,240. The FF&E budget is your money, paid at trade price with no markup, and is shown separately.



Design fee, Option B full service

Fixed for the scope in this proposal. Invoiced by stage.

Brief and concept

Weeks 1 to 4. Ends with a scheme chosen for every main room.

Total
$43600.00

Brief and concept

Weeks 1 to 4. Ends with a scheme chosen for every main room.

Item
Price
Quantity
Total

Site measure and lifestyle sessions

Principal 2 days, senior 2, designer 3.



$10240.00

Concept schemes, two per main room

Principal 4 days, senior 6, designer 6.



$23440.00

3D visuals and VR walkthrough

Visualizer 8 days.



$9920.00
Total
$43600.00

Developed design and specification

Weeks 5 to 12. One consolidated round of comments per drawing set.

Total
$53440.00

Developed design and specification

Weeks 5 to 12. One consolidated round of comments per drawing set.

Item
Price
Quantity
Total

Plans, elevations and joinery drawings

Principal 3 days, senior 8, designer 10.



$28920.00

Lighting plan and smart scenes

Senior 4 days, designer 3.



$9280.00

FF&E specification in the live tracker

Senior 5 days, designer 7.



$15240.00
Total
$53440.00

Procurement, install and styling

Weeks 13 to 35.

Total
$42800.00

Procurement, install and styling

Weeks 13 to 35.

Item
Price
Quantity
Total

Ordering, expediting and freight claims

Senior 6 days, designer 11. Around 60 orders.



$21200.00

Receiving coordination and install week

Principal 2 days, senior 4, designer 4.



$14320.00

Styling, three days

Principal 2 days, designer 3.



$7280.00
Total
$42800.00

Project management

10% of the design fee.

Total
$13984.00

Project management

10% of the design fee.

Item
Price
Quantity
Total

Programme, trades coordination and weekly updates

Across all three stages.



$13984.00
Total
$13984.00

FF&E budget, client-paid

An estimate at trade price, approved line by line in the tracker before any deposit. Paid by you directly against supplier invoices.

Furniture, lighting and window treatments

Fourteen rooms. Ranges firm up at specification.

Total
$508810.00

Furniture, lighting and window treatments

Fourteen rooms. Ranges firm up at specification.

Item
Price
Quantity
Total

Great room

Two sofas, walnut table, rugs, side pieces.



$96480.00

Kitchen and dining

Dining table, ten chairs, counter stools, pendants.



$71350.00

Primary suite

Bed, upholstered headboard panel, seating, lamps.



$64920.00

Lower level den

Sectional, acoustic panels, media joinery fittings.



$58740.00

Guest suite

Bed, desk, lounge chair, lamps.



$31860.00

Mudroom and entry

Bench, boot drawers fittings, mirror, rug.



$18470.00

Office, two bedrooms and baths

Furniture and accessories for the remaining rooms.



$58410.00

Decorative lighting

Pendants, wall lights and lamps across the house.



$47280.00

Motorized window treatments

Shades on smart scenes in nine rooms.



$38960.00

Freight, receiving and warehousing

Consolidated delivery to site in October.



$22340.00
Total
$508810.00

Contingency

10% of the estimate. Not spent without your approval.

Total
$50881.00

Contingency

10% of the estimate. Not spent without your approval.

Item
Price
Quantity
Total

FF&E contingency

For lead-time substitutions and freight surcharges.



$50881.00
Total
$50881.00





Total
$713515.00

The programme, set by lead times



Thirty-five weeks from Tuesday 2 March to Friday 29 October 2027. Assumes comments come back consolidated within three working days and the house completes on 1 October.



DayWeekMonthQuarterSemesterYear
M2Feb
M3Mar
M4Apr
M5May
M6Jun
M7Jul
M8Aug
M9Sep
M10Oct
M11Nov
Site measure and lifestyle sessions
Two schemes per room, VR walkthrough
Plans, elevations and joinery drawings
Lighting plan and smart scenes
FF&E specification and budget sign-off
Orders placed and deposits paid
Upholstery and joinery lead times
Receiving and inspection at our warehouse
Install week
Styling, three days
Brief and concept2 - Mar 12

Site measure and lifestyle sessions



Brief and concept15 - Mar 26

Two schemes per room, VR walkthrough



Design and specificationMar 30 - Apr 21

Plans, elevations and joinery drawings



Design and specification22 - Apr 30

Lighting plan and smart scenes



Design and specification4 - May 21

FF&E specification and budget sign-off

You approve every line before a deposit is paid.

Procurement1 - Jun 11

Orders placed and deposits paid



ProcurementJun 14 - Sep 24

Upholstery and joinery lead times

14 to 16 weeks. The date everything else waits for.

ProcurementSep 27 - Oct 15

Receiving and inspection at our warehouse



Install and styling19 - Oct 23

Install week



Install and styling26 - Oct 29

Styling, three days



Assumptions and terms



The parts of a furnishing project that cause most of the trouble. Written down now so they are settled before anything is ordered.



Who signs off orders

Nothing is ordered until you approve it in the tracker. Either of you can approve; we treat one approval as both. We place orders in our name at trade price and pass the invoice through to you without markup.

Changing your mind after an order is placed

Most custom upholstery and joinery deposits, usually 50 percent, are non-refundable once production starts. Stock items can often be returned with a restocking fee of 15 to 25 percent. We will tell you which is which before you approve.

Site access, storage and delivery

We assume the house is clean, heated and secure from 18 October, with the driveway clear for a 26 ft truck. Goods are held at our receiving warehouse until install; storage beyond 30 days is billed at cost.

Revisions and additional work

One consolidated round of comments per drawing set is included. A third concept scheme, rooms outside the fourteen listed or a second install trip are billed at the day rates in the fee.

Design fee payments

25 percent on signing, then the balance of each stage on completion of that stage, net 15 days. Invoices for FF&E are passed through as suppliers issue them.

Photography

We would like to photograph the finished house for our portfolio. No addresses, no family photos, and you see every image before it is published.

From owners who have lived with the result



Our sofas came in two weeks late and Tasha had already moved the install date and rebooked the movers. We found out from the revised schedule, not from a crisis.

Natalie Okerlund

Owner, Larkspur Ridge House, Boulder

Every buyer walkthrough ran off their live tracker. Two of our three show homes sold furnished inside six weeks, which has never happened to us before.

Graham Whitlow

Development Director, Sawtooth Row Homes

Clare told us the table we loved would block the view from the kitchen and proved it in VR in five minutes. We changed it. Every guest now sits facing the peaks.

Daniela Ruiz-Hartley

Owner, Gold Hill House

Approve Option B and we hold 2 March



This proposal holds until Friday 26 February 2027. Approve it by then and Clare and Owen will be at the house on Tuesday 2 March for the site measure and your first lifestyle session.



Prepared by



Clare Haverty Founder and Principal, Pinyon Studio

2950 Larimer Street, Suite 4 Denver, CO 80205 clare@pinyonstudio.com

For approval by



Priyanka Desai and Martin Kowalczyk Owners, the Desai Kowalczyk House

Evergreen, CO priyanka.desai@desaikowalczyk.com

Sign here
En approuvant ce document, vous le signez électroniquement.

Approve the full-service proposal

By confirming, you appoint Pinyon Studio for Option B at a design fee of $153,824, from Tuesday 2 March to Friday 29 October 2027. A 25 percent retainer of $38,456 is invoiced on signing. The FF&E budget of $559,691 including contingency is paid by you directly, line by line as you approve it.