Made with Formlio


Cedar-lined reception with an orange steel stair on a new tower floor


Okada Wren Interiors

Statement of work · Okada Wren Interiors



Two floors for Corvane Robotics, occupied February 2028.



Interior design, specification and FF&E management for 36,400 sq ft on levels 14 and 15 of Halyard Tower, South Lake Union. Test fit to move-in.

Prepared for

Corvane Robotics



Issued

Monday 15 March 2027



Design fee

$401,420, fixed

Cedar-lined reception with an orange steel stair on a new tower floor

Parties, dates and scope



This statement of work sits under the master services agreement Corvane signed with us on 1 March 2027. Where the two disagree, the agreement governs.



Client

Corvane Robotics, Inc.



Studio

Okada Wren Interiors, est. 2016, 14 staff



Premises

Halyard Tower, levels 14 and 15, 36,400 usable sq ft



Term

5 April 2027 to 15 February 2028

What we are delivering



Your Series C closed in February and headcount goes from 140 to 260 by mid 2028. The two floors hold 212 desks, 48 lab benches and a 2,800 sq ft robot test arena that needs 150 psf floor loading and acoustic isolation from the floor below.

We run programming, design, the permit set, FF&E specification and procurement management, and construction administration through to occupancy on Monday 14 February 2028. Tessaro Lind Architects stamp the permit drawings as architect of record under our contract. Mika Okada leads design. Ellis Wren owns the programme and every long-lead order.

The chairs set the date, so we order them in September.
TThhee cchhaaiirrss sseett tthhee ddaattee,, ssoo wwee oorrddeerr tthheemm iinn SSeepptteemmbbeerr..

Delivery method



Negotiated general contractor with design-assist. It costs a little more up front and removes the bid surprise, which a fixed occupancy date cannot absorb.



One model from week one

A single Revit model shared with Tessaro Lind, the engineers and the contractor. You get a browser viewer and a live FF&E tracker, not PDFs by email.

Contractor on board at DD

You select the general contractor from three we prequalify. They price at 50% design development, so the estimate is within 3% before drawings are final.

Long-lead orders released early

Workstations, task chairs and upholstered booths run 14 to 18 weeks. We release them on your sign-off in September, before the permit is issued.

Permit set filed 27 August

Tenant improvement application to SDCI. Review runs about ten weeks and is outside our control, so nothing on site depends on it earlier.

Weekly OAC meetings on site

Owner, architect and contractor every Tuesday at 08:30 during construction. Minutes and an updated risk log within 24 hours.

Punch list closed before move-in

Two walkthroughs, ten working days apart. Anything open on the second is fixed or credited before your team arrives.

Deliverables by phase



What you receive and sign off at the end of each phase. Each sign-off is the gate for the next fee stage.



Programming and test fit

Headcount model to 2029, adjacency matrix and two test fits per floor. Includes a structural check of the arena zone against the landlord's slab drawings.


Open floor plate of a new tower before fit-out

Schematic design and finishes palette

Plans, key elevations and a finishes palette of nine materials. Photoreal 3D views of reception, the arena and the work floor, plus a VR walkthrough for your leadership team.


Cedar slats, concrete and orange felt

Design development and lab detail

RCP, lighting and power plans, joinery details and the arena enclosure. Lab benches specified with 208V power drops and ESD flooring.


Robotics lab with steel benches and cedar baffles

Construction documents and specification

Permit and bid set, finish schedule and full FF&E specification. Every product carries its lead time, warranty and a recycled content figure.


Sample set of cedar, felt, steel and terrazzo

Procurement, install and handover

Purchase orders tracked line by line on the shared dashboard, delivery sequenced floor by floor, install supervised. Handover with an as-built model and a maintenance schedule.


Completed work floor with oak desks and grey booths

Programme



45 weeks to occupancy. Two waits drive it: SDCI review and FF&E lead times. Assumes Corvane sign-off within three working days at each gate.



DayWeekMonthQuarterSemesterYear
M4Apr
M5May
M6Jun
M7Jul
M8Aug
M9Sep
M10Oct
M11Nov
M12Dec
M1Jan
M2Feb
M3Mar
Programming and test fits
Schematic design, 3D and VR review
Design development, GC pricing at 50%
Construction documents and permit set
SDCI tenant improvement review
FF&E specification and order release
Manufacturer lead times
Tenant improvement construction
FF&E install and punch list
Corvane moves in
Design5 - Apr 30

Programming and test fits



DesignMay 4 - Jun 4

Schematic design, 3D and VR review



DesignJun 8 - Jul 16

Design development, GC pricing at 50%



PermitJul 20 - Aug 27

Construction documents and permit set



PermitAug 30 - Nov 5

SDCI tenant improvement review

About ten weeks. Not in our control.

FF&EAug 2 - Sep 3

FF&E specification and order release



FF&ESep 7 - Jan 14

Manufacturer lead times

Task chairs 14 weeks, booths 16, workstations 18.

ConstructionNov 8 - Jan 28

Tenant improvement construction



ConstructionJan 31 - Feb 11

FF&E install and punch list



Occupancy14 - Feb 15

Corvane moves in



Fee and payment schedule



US dollars, fixed at $11.03 per usable sq ft, architect of record and MEP engineers included. FF&E is separate: $1.36m to $1.52m plus 10% contingency, bought by Corvane at our trade pricing. Retainer of $40,142 on signing, then monthly by phase, net 30.



Design fee

Professional services, by phase

Each phase is invoiced as it completes. The retainer is credited against the final invoice.

Total
$401420.00

Professional services, by phase

Each phase is invoiced as it completes. The retainer is credited against the final invoice.

Item
Price
Quantity
Total

Programming and test fit

Headcount model, adjacencies, two test fits per floor.



$31640.00

Schematic design

Plans, finishes palette, 3D views and VR walkthrough.



$58420.00

Design development

RCP, lighting, power, joinery and arena enclosure.



$84960.00

Construction documents and permit set

Stamped by Tessaro Lind, filed with SDCI.



$97380.00

FF&E specification and order management

About 1,100 line items on the shared tracker.



$46270.00

Bid support and construction administration

Weekly OAC meetings, RFIs, submittals, 14 weeks on site.



$63815.00

Install, punch list and as-built model





$18935.00
Total
$401420.00

Optional services

Not in the fixed fee. Add either now or at schematic design at the same price.

Add-ons

Total
$0.00

Add-ons

Item
Price
Quantity
Total

Acoustic modeling of the test arena

With a third-party acoustician, before DD.



$12480.00

Environmental graphics and wayfinding

Both floors, using your brand system.



$21760.00
Total
$0.00





Total
$401420.00

Three references you can call



Workplace and lab fit-outs on fixed occupancy dates. Contact details are in the reference pack we send with the countersigned SOW.



They released our task chair order before the permit came back. The base building handed over three weeks late and we still moved in on the planned Monday.

Gabriel Strommen

VP Operations, Brightwater Instruments

The live FF&E tracker replaced a weekly status call. Finance watched 1,140 line items land against budget and never once asked for a spreadsheet.

Nkechi Hollander

Controller, Fernhill Payments

Our test lab needed 150 psf and a clean power ring. Ellis found the slab limit in the landlord's drawings before we signed the lease amendment.

Arjun Mehta-Rowe

Head of Hardware, Tamarack Autonomy

Terms specific to this SOW



The points that decide whether the fee and the February date hold. Everything else is in the master services agreement.



Who owns the drawings and the model

Corvane owns the construction documents and the as-built model on payment in full, and may use them to maintain and alter the premises. We keep the right to reuse our details and specifications elsewhere, and to photograph the finished floors after a 90-day embargo you can extend once.

Revisions included in each phase

Two rounds of revision per phase. A third round, or a change to a signed-off phase, is additional services. Moving the test arena after schematic design sign-off counts as a change to a signed-off phase, because it moves structure, power and acoustics together.

How change orders are priced

Additional services are billed at $215 per hour for principals, $168 for senior designers and $132 for designers. We send a written estimate and impact on the programme before starting. Nothing proceeds on a verbal instruction, including in OAC meetings.

FF&E deposits and cancelled orders

Manufacturers take 50% deposits when an order is released. Corvane approves each purchase order in the tracker before release. After release, a cancelled or changed order carries the manufacturer's restocking charge, typically 25 to 35%, and may lose its delivery slot.

What happens if the permit runs long

SDCI review is outside our control. If it runs past 5 November 2027 the construction start moves day for day, and we will tell you within two working days which of the occupancy-critical tasks can be resequenced.

Liability and insurance

Our liability is capped at the fee for this SOW. We carry $2m professional liability and $2m general liability, and Tessaro Lind carry their own. Certificates are issued to Corvane and the landlord before work starts.

Measured at handover



Six figures we design to, test on site and report in the closeout pack. If one misses, we say why and what it costs to close.




0



Desks, both floors



Plus 48 lab benches. Sized for 260 people at 82% peak occupancy.


0 psf



Arena floor loading



Checked against the slab drawings in week two.


0.00



Minimum NRC, open areas



Cedar baffles and felt panels, verified with a reverberation test on level 14 before FF&E install.


0%



Recycled or remanufactured FF&E



By cost. Includes 96 refurbished task chairs.


0 wk



Longest lead time



Workstations. The order is released on 3 September 2027.


0%



Estimate tolerance at DD



Between the GC price and the final contract sum.

Next step



This SOW holds until Friday 26 March 2027. After that the September order release, and with it the February date, needs re-checking with the manufacturers.



Prepared by



Mika Okada Principal, Okada Wren Interiors

Suite 300, 1418 Dexter Avenue N Seattle, WA 98109 mika@okadawren.com

For approval by



Leah Tanaka-Brandt Chief Operating Officer, Corvane Robotics

We have held Tuesday 23 March at 10:00 on level 14 to walk the floor with you and your landlord's project manager.

Sign here
By approving this document, you sign it electronically.

Countersign this statement of work

By signing, Corvane appoints Okada Wren Interiors for the scope above at a fixed fee of $401,420, starting Monday 5 April 2027 for occupancy on Monday 14 February 2028. The $40,142 retainer is invoiced on signing.